Description
Use for: Attaching an installation and commissioning policy to an EV charging bid or operating manual.
Deliverable purpose: Standardise how charge points are installed, tested and accepted into service.
Drafted as a signable corporate policy for a bid annex: policy statement and scope; site survey and electrical assessment; permitting and utility coordination; installation standards and workmanship; equipment verification; commissioning tests and acceptance criteria; documentation and as-built records; handover to operations; competence requirements; approval and signature block. Editable Microsoft Word file. Name your own accountable owner, review cycle, thresholds and approval authority.




